Thank you for sending your enquiry! One of our team members will contact you shortly.
Thank you for sending your booking! One of our team members will contact you shortly.
Course Outline
Formulating Strategy and Conducting Assessment
- Identifying business drivers and defining migration goals.
- Exploring migration patterns: rehost, replatform, refactor, and replace.
- Utilizing AWS Migration Readiness Assessment (MRA) and discovery tools.
- Prioritizing applications and developing a structured migration roadmap.
Discovery, Inventory, and Planning
- Gathering inventory data and mapping dependencies.
- Estimating Total Cost of Ownership (TCO) and sizing AWS resources.
- Assessing risks and planning cutover procedures.
- Structuring migration waves and defining rollback strategies.
Server Migration via AWS Application Migration Service (MGN)
- Understanding MGN architecture and the migration workflow.
- Managing replication settings, snapshots, and bandwidth requirements.
- Testing replicated servers and executing trial cutovers.
- Performing final cutover and validation steps.
Database Migration with AWS DMS
- Key DMS concepts: full load, CDC, and continuous replication.
- Source and target requirements, along with basic schema conversion.
- Reducing downtime and ensuring data integrity.
- Operational duties: monitoring, performance tuning, and troubleshooting.
Data Transfer, Networking, and Security
- Data transfer methods: AWS DataSync, Snow family, and direct connections.
- VPC design, routing, security groups, and migration connectivity.
- Managing identity, access controls, and encryption during the transition.
- Considering firewalls, DNS, and networking during cutover.
Testing, Cutover, and Post-Migration Operations
- Executing validation tests, performance benchmarks, and QA checks.
- Establishing rollback plans and contingency measures.
- Post-migration tuning: right-sizing, autoscaling, and cost management.
- Creating operational runbooks, monitoring setups, and backup strategies.
Practical Workshop: End-to-End Migration Scenario
- Conduct discovery and plan a migration wave for sample workloads.
- Replicate a server using MGN and perform a test cutover.
- Migrate a sample database using DMS and verify the results.
- Finalize cutover, validate services, and reflect on key learnings.
Summary and Future Steps
Requirements
- Foundational knowledge of IT infrastructure and networking.
- Proficiency with virtualization and operating systems (Windows/Linux).
- Basic comprehension of database and storage concepts.
Target Audience
- Cloud architects and engineers.
- Infrastructure and operations teams.
- IT managers and project leads overseeing migration initiatives.
14 Hours
Testimonials (1)
I've find out new interesting things about Lambda and Serverless